Working with main contractor Leisure Energy, we were engaged to provide the M&E install to replace the aging gas heating system with their Net Zero Pod solution. The Leisure Centre was fully operational throughout the works, meaning we had to maintain heat to the system to ensure pool and air temperatures were comfortable the users.
A fully-coordinated switchover meant their heating systems were offline for a matter of hours, temperatures remained and the leisure provider was happy.
Net zero heating, with an efficient system providing heating and hot water to the leisure centre.